GESU
Home Contact Request a Quote
← All references

ARTUR Holiday Resort — Packaged Treatment Plant (1,600 m³/day)

Engineering, in-house equipment manufacturing and installation by GESU — Bursa, Türkiye.

GESU Water Treatment Systems
GESU Arıtma

Project data

Location
ARTUR Tatil Köyü
Year
2000
Capacity
1.600 m³/day
Installed system
Evsel biyolojik paket AAT — 1.600 m³/gün, 8.000 kişi eşdeğeri
Sector
Evsel · Paket Arıtma
Contractor
GESU Arıtma Sistemleri San. ve Tic. Ltd. Şti. — Bursa, Türkiye

GESU carries out engineering, equipment manufacturing and installation under one responsibility; most equipment is produced in our own factory in Bursa (5,000 m² total, 2,000 m² covered). Effluent values depend on the characteristics of the incoming wastewater and are established after analysis.

Need a similar plant?

Send us your wastewater analysis and daily flow — our engineer comes back with a preliminary assessment within 2 business days. The preliminary assessment is free and without obligation.

GESU Arıtma Sistemleri · Bursa, Türkiye · +90 224 483 59 39 · info@gesu.com.tr