← All references
Aynes Dairy Factory — Biological Treatment Plant, Denizli (2,000 m³/day)
Engineering, in-house equipment manufacturing and installation by GESU — Bursa, Türkiye.

Project data
Location
Denizli, Türkiye
Capacity
2.000 m³/day
Installed system
Biyolojik AAT + DAF + dram elek + dekantör
Sector
Gıda — Süt · Biyolojik AAT + DAF
Contractor
GESU Arıtma Sistemleri San. ve Tic. Ltd. Şti. — Bursa, Türkiye
GESU carries out engineering, equipment manufacturing and installation under one responsibility; most equipment is produced in our own factory in Bursa (5,000 m² total, 2,000 m² covered). Effluent values depend on the characteristics of the incoming wastewater and are established after analysis.
Need a similar plant?
Send us your wastewater analysis and daily flow — our engineer comes back with a preliminary assessment within 2 business days. The preliminary assessment is free and without obligation.
GESU Arıtma Sistemleri · Bursa, Türkiye · +90 224 483 59 39 · info@gesu.com.tr